"Pre-testing, CFD analysis, and Post-testing were successfully executed within the stipulated time, helping us achieve uniform flow and velocity distribution within the boiler and ducts. We appreciate TEFUGEN for their dedication and commitment to the successful completion of the aforesaid project."
ADHUNIK POWER AND NATURAL RESOURCES LIMITED
“We would like to certify that TEFUGEN Technologies Private Limited, Tiruchirappalli, has successfully completed the CFD Analysis - Flue Gas Duct optimization from the "Economizer outlet to ID fan inlet," including Pre-testing and Post-testing for Adithya Aluminium Limited, Lapanga, as per the defined scope. The CFD analysis report presented by TEFUGEN yielded positive results, leading to the subsequent installation of guide vanes in the flue gas ducts.”
ADITHYA ALUMINIUM LIMITED
“The work order for Pre-testing, CFD analysis, and Post-testing of the flue gas duct circuit was executed successfully by TEFUGEN’s team of experienced engineers and analysts, and the overall performance was found satisfactory.”
ROSA POWER SUPPLY COMPANY LIMITED, SHAHJAHANPUR
“TEFUGEN has been a tremendous contributor to the success of our various projects, and we strongly endorse their services for projects that demand complexity or high-quality standards.”
GEECO ENERCON PVT. LIMITED, TIRUCHIRAPALLI
"TEFUGEN's flow optimization technique using CFD analysis drastically reduced the pressure drop and helped us to achieve uniform flue gas flow distribution and thus reduced the erosion of ducts”